Having returned from holiday we are now pushing to get the house finished.
The glass roof at the rear of the building is being installed this week. Probably take about 5 days.
The interior of the house is being painted.
The solar side is taking shape with a huge 400 litre thermal store cylinder and pipe work everywhere.
The fitted bedroom furniture has been installed in bedrooms 2 & 3 and the walk-in wardrobe furniture has been fitted. Looks lovely.
The electric light fittings are being installed.
The bathrooms have been tiled and the bathroom showers, sinks etc are being fitted at the moment.
Garden walls have been spray rendered and capped.
The patio area and front drive has been prepared with hard-core ready for the block pavers and slabs.
We are aiming to move in on the 12th April, which is our 25th Wedding Anniversary.