Steady progress is being made with the roof, the joists are all up bar the overhang at the front and back and the 3/4 ply
wood sheets are being nailed on, with spaces being left for the velux windows.
The steps down from the lounge have had their footings dug and a row of breeze block have been cemented into place.
What with exchanging contracts on our house today things are looking good.
No comments:
Post a Comment