Monday 4 October 2010

The roof is taking shape


Steady progress is being made with the roof, the joists are all up bar the overhang at the front and back and the 3/4 plywood sheets are being nailed on, with spaces being left for the velux windows.
The steps down from the lounge have had their footings dug and a row of breeze block have been cemented into place.
What with exchanging contracts on our house today things are looking good.













No comments:

Post a Comment